• kenburns1

ELECTRO-MAGNETIC SCANNING OF PRE-STRESSED CONCRETE PIPES

The pipe can be scanned even when it is up to 40% full of water; Pre-stressed concrete Pipelines of 700mm till 4000mm can be scanned; Analyzing Tool enables instant results – facilitate marking of damaged areas during scanning operations; Not only categorize the classes of wire breaks but also quantify down to a single wire break; Between two and ten kilometres can be scanned per day

ORE SILO REHABILITATION

Ore silo cleaning Reinforcement replacement Hi abrasive resistant Shot Crete lining External post tensioning cables

SPRAYED CONCRETE

Sidewall support repair and construction Ore Silos Repairs Blow down Sump Repairs

TAILINGSDAM – PENSTOCK REHABILITATION

Penstock cleaning Penstock sealing Penstock Construction

CONCRETE REPAIRS

Large Diameter Steel Pipeline Construction (300mm – 2500mm) Bridge repairs Cooling tower repairs Clarifier repairs Smoke stack repairs Reservoir repairs

BULK EARTHWORKS

Commercial development Industrial development General earthworks

CARBON FIBRE REPAIRS

Non-invasive repair method. Internal as well as external repairs are possible. External repairs can be performed when the pipelines are still under pressure. Due to the inherent properties of carbon fibre and our vacuum epoxy infusion technology, reductions in diameter of pipes due to the repair are minimized. An optimal carbon fibre – epoxy ratio of 60/40 can be obtained. An equal and homogeneous end product is obtained. In PCP pipelines, the condition of the pre-stressed wires can still be monitored after carbon fibre repair. There is a safety factor of three.

BULK WATER PIPELINE CONSTRUCTION

Large Diameter Steel Pipeline Construction (300mm – 2500mm) Valve Installation Valve Replacement Major Infrastructural Pipeline Construction Slip Lining Joint Sealing Structural Repairs Coating & Lining Sectional Replacement

JOINT SEALS

Quick to install (Up to 40 Seals per day, per team). South African based production unit can produce seals at an output of up to 100 per day. Specific tools are available for tensioning and securing the tension of the stainless steel rims. Experienced technicians are available for training the client’s crew. Pressure testing is available if required.

OUR SPECIALISED SKILLS


Bulk Water Pipeline Construction

Route Survey and Setting Out
Trench Excavation
Pipe laying and Specialized Welding
Backfilling and Compaction
Valve Chamber Construction
Valve Installation

Specialized Civil Works

Construction of large bases, plinths, columns, beams, foundations and walls.
Sprayed Concrete Design and Application.

Ore Silo Rehabilitation

Ore silo cleaning
Reinforcement replacement
High abrasive resistant Shot Crete lining.
Rail Lining Rehabilitation
External post tensioning cables

Penstock Rehabilitation

High Pressure jet washing
CCTV Camera Inspection
Penstock Grout Sealing
Construction of Drainage System